Our customer was responsible for the construction of the Topside Modules of the P75 and P77 FPSO's.
As the modules were being finalized in China, the pancakes and other steel structures had to be shipped from Thailand.
Our job consisted on the charter of a Heavy Lift Vessel, as well as liaison between Carrier's Engineering Department, as well as Customer's Marine Warranty Surveyor to assure all procedures of Lifting, Lashing and Securing were properly done.
The voyage was executed on a Last In First Out basis and the cargo arrived at its destination 2 weeks after being loaded.