Newwave Media srl

en

Los Condores hydro power plant

Period:
2 x Rotors
95 Tons each
2 x Stators
110 tons each
FCA Santos Port, Brazil
DAP Inside Cave at jobsite
in Los Condores, Chile
america
Power Generation and Trasmission
Multimodal Logistics

Our scope of work included the reception at Santos port, loading/stuffing onto Mafi Trailers, ocean freight from Santos to San Antonio, unstuffing of Mafi Trailers and loading to Axle Lines, road transportation to the jobsite, located in the Andes mountains and delivery inside the cave.
The project was performed in 4 separated shipments.

Utilizzando questo sito web si acconsente all'utilizzo di cookies in conformit√† alla nostra politica sui cookies   Ok